Ishi Solar Loading...
Ishi Solar
Home About Us
Products
Blog Contact Us
State Government Scheme

Mukhyamantri Saur
Swarojgar Yojana

Turn Your Barren Land into a 25-Year Income Stream.

Become an independent power producer. We help entrepreneurs and farmers set up 25kW solar power plants and sell electricity directly to the government grid.

The Business Model

MSSY is designed to stop youth migration and empower local citizens by making them green-energy entrepreneurs.

Your Land

Utilize ~1.5 Nali (approx. 3000 sq ft) of unused or barren land.

25kW Solar Plant

Ishi Solar handles the DPR, Bank Loan, and sets up a robust 25kW power plant.

Guaranteed Income

Power is sold to the Govt. via a 25-Year Power Purchase Agreement (PPA).

Revenue Projection

What is the Earning Potential of a 25kW Plant?

Under the MSSY scheme, the state power corporation signs a 25-year Power Purchase Agreement (PPA) with you, securing a fixed tariff for every unit of electricity you generate. Here is an estimated projection.

Daily Generation

~100 Units (kWh)

Annual Generation

~33,000 Units

Estimated Returns

Based on standard PPA tariffs

Estimated Yearly Income: ~ ₹1.5 Lakhs
Loan EMI Repayment: Covered by Plant Income
25-Year Lifetime Revenue: ~ ₹37.5 Lakhs*

*Estimates are subject to exact weather conditions, site location, and the final state tariff mandated by the regulatory commission.

We Build Businesses, Not Just Plants

From handling complex banking paperwork to long-term maintenance, Ishi Solar ensures your investment is secure and stress-free.

DPR & Bank Loan Liaison

We draft the Detailed Project Report (DPR) required by the nodal agencies and assist you in securing your MSME bank loan at the lowest possible interest rate.

PPA & Grid Synchronization

We handle the grueling paperwork with the state DISCOM to sign your 25-Year Power Purchase Agreement and safely synchronize your plant to the 11kV grid.

Operations & Maintenance

Your business is only as good as the power it generates. We offer robust O&M contracts to clean your modules and monitor your plant's generation 24/7.

Requirements

Who Can Apply?

Age & Residency

Must be 18+ years of age and a permanent resident of the state.

Land Availability

Approx. 1.5 to 2 Nali (3000 to 4000 sq. ft.) of shadow-free land or rooftop space.

Grid Proximity

The land must be close to a 11kV/33kV grid substation for easy power evacuation.

Government Financial Support

The scheme provides massive MSME subsidies to lower your capital burden.

Category A (General) 15% Subsidy
Category B (SC/ST/OBC) 25% Subsidy

Easy Bank Loans

Up to 70% of the project cost is funded by state co-operative and nationalized banks at subsidized MSME interest rates. You only pay 10-15% as margin money!

Your Complete Implementation Partner

Navigating government approvals and grid integration can be daunting. Ishi Solar provides an end-to-end turnkey solution.

1. DPR Preparation

We prepare the highly technical Detailed Project Report (DPR) required for your application and bank loan approval.

1

2. Departmental Approvals

We coordinate with UREDA (or state nodal agency) and UPCL (DISCOM) for technical feasibility and PPA signing.

2

3. EPC Construction

Using Tier-1 ALMM approved modules, we build a heavy-duty, weather-resistant 25kW power plant on your land.

3

4. Grid Sync & Income Starts

We install the export meter, sync the plant with the 11kV grid, and your 25-year income journey officially begins.

Frequently Asked Questions

Clear your doubts about the Mukhyamantri Saur Swarojgar Yojana.

What type of land is required for MSSY?

The scheme is specifically designed to utilize barren or uncultivable land. However, you can also set up the 25kW plant on structurally sound commercial rooftops or agricultural land, provided it receives shadow-free sunlight throughout the day.

How does the bank loan repayment work?

Banks typically fund up to 70% of the project cost under the MSME sector. Once your plant is commissioned, the state government pays you monthly for the electricity you generate. A portion of this monthly income is automatically deducted as your EMI, and the rest is your profit. The loan is usually paid off within 5 to 7 years.

Do I need to be technically skilled to run this?

Not at all. The plant operates automatically. As your EPC partner, Ishi Solar handles the technical design, installation, and can provide ongoing Operations & Maintenance (O&M) to clean the panels and monitor the system remotely.

How far can the land be from the electric grid?

To minimize transmission losses and the cost of drawing cables, it is highly recommended that your land is within 300 to 500 meters of the nearest 11kV or 33kV electric substation or transformer.

Free Site Assessment

Inquire about MSSY 25kW Solar Business

Fill out the form below. Our technical experts will analyze your requirements and provide a customized projection.

+91 965 004 6041
info@ishisolar.com
Chat with an Expert!